Views: 0 Author: Site Editor Publish Time: 2024-03-13 Origin: Site
Insulation board has performance characteristics such as high fire resistance, high heat preservation, relatively good strength, not easy to break, lightweight, non-toxic and harmless, long life, good water resistance, good interface, energy saving, and safety. However, the construction of the Roof insulation board is a very difficult project. If you are not careful, it will easily cause unnecessary troubles and affect normal use in the future. So do you know how the insulation board is constructed? What are the precautions for the construction of the Insulation board?
Here is the content list:
How is the insulation board constructed?
What are the precautions for the construction of the insulation board?
1. In the first step, the base surface should be cleaned to ensure that there are no dust and oil stains, and the hollow areas should be repaired.
2. Secondly, measure the construction surface, hang the reference line, and paste the overturned mesh to achieve compactness and smoothness.
3. Then fasten the Thermal insulation foam board with anchor nails. If the connection is not normal, use coarse sand to make a primer and polish it.
4. Finally, apply the top layer.
1.Before the construction of the Insulation board, you should check whether the wall is flat. If there is any unevenness, you should deal with it immediately to ensure that the subsequent construction will not be affected. At the same time, after the external doors and windows are installed, relevant units are invited to inspect and pass the inspection if they meet the standards, or if they need to be rectified and repaired.
2. During the construction of the Insulation decorative plate, it is necessary to reserve enough gaps between the frame of the door and window and the wall, and it must be consistent with the thickness of the insulation layer. After that, thermal insulation material should be added to the gap, and it should be sealed tightly at the same time. After everything is processed, the protection work of the wall surface should be carried out to prolong its service life.
3. Before construction, you should pay attention to the temperature of the construction site. Only when the construction requirements are met can the construction be carried out. If the temperature of the construction site is required to be above 5°C, the wind force must be controlled below level 5. At the same time, if it is bad rainy weather, it is recommended to postpone the construction to prevent the instability of the insulation layer and affect later use.
The above is the whole content about the construction of the Fire insulation board introduced by W.T Thermal Insulation Material Co., Ltd., do you understand it? I hope that the introduction of W.T. Thermal Insulation Material Co., Ltd. can help you. If you want to know more about it, you can contact us. Our website is https://www.wt-insulation.com/, Welcome your arrival, and look forward to cooperating with you.